2018, Basel
After the Praesidium Meeting Ramon Keller leads in the room of the north tower
In the tower room Cathedral Master Jürgen Prigl is named Honorary President of the EACD in recognition of his exceptional services to the organization. Laudatio for Jürgen Prigl
After the ceremonious granting there is a guidance about the roofs of Basel Münster
The participants of the Preasidium Meeting with the President of the EACD Janos Kampfl and Honorary President of the EACD Jürgen Prigl. Behind of them from right to left Ramon Keller, Tamara Plastic, Georg Obererlacher, Virginia Tanzer, Franz Kurz und Norbert Kienesberger.
Basel Münster is the biggest church construction in the region of Basel and is only towered above by the tower of the Elisabethkirche with 3.2 metres.
A splendid view over Basel
Meetings with cathedral master and architect Andreas Hindemann to the especially detailed guidance in and around the Münster.
Greeting of the EACD
around Münster with detailed discussion about specific features and technical details.
Detailed discussion in the interior
With the building site lift it goes on the roof of Münster
Explanation of the works of Ramon Keller
|